#1 Facility Overhaul - Thiru Primary

Project Completion Report

Introduction Thiru Primary School is a public primary school located in Marmanet Ward, Laikipia County, Kenya. Established in 1978, the school serves approximately 700 students aged 6 to 15 years. As a rural institution, Thiru Primary School has faced significant challenges due to overstretched facilities, necessitating urgent intervention.

Project Justification Thiru Primary School was selected as a beneficiary of the TFalls Foundation Inc. due to critical infrastructure deficiencies that hindered effective learning and a conducive school environment. A thorough needs assessment identified the following pressing issues:

  • Old and dilapidated classrooms requiring urgent repairs.

  • Overcrowded classrooms, creating an unconducive learning environment.

  • Poor sanitation due to inadequate washrooms and lack of handwashing facilities.

  • A deteriorating administration block that was unsafe and unsuitable for school operations.

  • Many pupils lacked proper school uniforms due to financial constraints.

  • The absence of a reliable source of clean drinking and washing water.

Project Implementation Following the needs assessment, TFalls Foundation Inc. launched infrastructure improvement projects on December 13, 2019. The project aimed at addressing the most urgent needs to enhance learning conditions and overall school operations. The work was completed in December 2022, and the upgraded facilities were officially commissioned for use.

Completed Sub-Projects To improve the school's infrastructure and learning conditions, the following developments were undertaken:

a) Classroom Renovation and Construction:

  • Completion and furnishing of two previously unfinished classrooms with new desks and chairs.

  • Construction of four additional new classrooms, fully equipped with necessary learning materials.

  • Construction and furnishing of two kindergarten classrooms to cater to early learners.

b) Sanitation and Hygiene Facilities:

  • Construction of a modern restroom block for both boys and girls.

  • The restroom facilities included washrooms with ceramic bowls, modern urinals, sinks, tiled floors, and shower areas.

  • Running water was installed to promote hygiene and sanitation.


    ree

c) Water Supply System:

  • A new well was dug to provide a reliable source of clean drinking and washing water.

  • A submersible pump was installed for efficient water extraction and distribution.

d) Administration Block:

  • A new administration block was constructed to provide a proper working environment for the school’s management and staff.


    ree

Project Impact The completion of these projects has significantly improved the learning and working environment at Thiru Primary School. Key benefits include:

  • Reduced classroom congestion, creating a more conducive atmosphere for learning.

  • Improved sanitation and hygiene, reducing health risks among students.

  • Access to clean water, improving overall school hygiene and hydration.

  • Enhanced administrative operations due to a modern and functional office block.

  • Better learning conditions for kindergarten pupils with dedicated classrooms.


Conclusion The infrastructure overhaul at Thiru Primary School, facilitated by TFalls Foundation Inc., has greatly transformed the school’s learning environment. The improvements will have a lasting impact on students' academic performance, health, and overall well-being. The foundation remains committed to supporting education and enhancing the quality of learning environments in rural schools.


Acknowledgment

TFalls Foundation Inc. expresses gratitude to all stakeholders, including school administrators, local authorities, and the community, for their cooperation and support in the successful execution of this project.

before

after

Two Kindergarten Classrooms - Thiru

Build two kindergarten classrooms to replace wooden semipermanent structures

STATUS:

Complete

BUDGET: $

45000

STARTED:

ENDED:

1/1/22

12/31/22

COST: $

43800

before

after

New Administration Block - Thiru

Build an administration block for all the teachers. Previously, a single classroom was being used as the administration block, storage and kitchen.

STATUS:

Complete

BUDGET: $

37867

STARTED:

ENDED:

1/1/22

12/31/22

COST: $

43547

before

after

Two New Classrooms - Thiru

Two new classrooms

STATUS:

Complete

BUDGET: $

30000

STARTED:

ENDED:

5/1/23

12/31/23

COST: $

34500

before

after

Finished & Furnished Two Classrooms - Thiru

TFalls Foundation helped in finishing up construction of 2 classrooms that had been ongoing for long time.

STATUS:

Complete

BUDGET: $

40250

STARTED:

ENDED:

6/1/20

12/31/20

COST: $

46600

before

after

Bathroom Block With Sixteen Bathrooms - Thiru

A block of 16 bathrooms with shower, store, changing rooms, sinks and a septic tank.

STATUS:

Complete

BUDGET: $

25000

STARTED:

ENDED:

6/1/20

12/31/20

COST: $

29962

Add a Title
Add a Title
Add a Title
Add a Title
Add a Title
Add a Title
Add a Title
Add a Title
Add a Title
Contact Us

224 Sable Trace Dr
Acworth, GA 30102

info@tfallsfoundation.org

Connect with us
SUBSCRIBE

Thanks for submitting!

Registered Charity PHONE Number : +1 678-770-6087

bottom of page